Project Highlights

Speedway Remodel

An existing fueling station undergoing a massive overhaul, located in London, OH.

Challenges: While the existing store is staying operational, over 100,000sf of asphalt paving is being removed and replaced with heavy duty concrete paving.

QuikTrip Brookville

A brand-new fueling station located in our own hometown of Brookville, OH.

Challenges: Pour-soil bearing required a specialty installment of concrete caissons for the canopy foundations drilled 18 feet deep.

Day Air Ballpark

Addition to the Dayton Dragons baseball stadium in downtown Dayton, OH.

Challenges: Very tight job-site, excavating around existing utilities, and working alongside other trades.

Brubaker Grain

Adding a grain bin to the existing facility in West Alexandria, OH.

Challenges: Over excavation, fill, and compaction to stabilize the base for foundation bearing.

Renew Miami Chapel

A low-income neighborhood development project in Dayton, OH, including interior slabs and sidewalks.

Challenges: The site layout includes nine-buildings in a tight formation, making clear coordination with other trades and general contractors important.

Storage of America

This Dayton location included 13 total buildings - encompassing over 79,000 square feet

Challenges: Fast spaced schedule required multiple buildings to be completed simultaneously to meet the deadlines.

Reserve of Sugarcreek

A large multi-family development in Centerville, OH.

Challenges: Construction commenced in January, meaning a cold and muddy start, but the consistent design between building types allowed for very efficient crews and high production.

Easton Farm

Once the location of a local farm market in Springboro, OH, this is now the site of a multi-family housing project.

Challenges: Over ten apartment buildings and one clubhouse set on a rapid timeline forced us to maintain a tight schedule and efficient use of manpower.

CRC Building 1

A four-story, 87,000+ square-foot office building in Fairborn, OH.

Challenges: Large elevated deck pours required extra safety precautions and extensive coordination with steel erectors.

Rushlight Ventures

A new construction HQ located in Miamisburg, OH.

Challenges: Poor soil remediation for the foundations and a large decorative stamped concrete patio.

Ready to start your next project? Let’s build it together.